Not necessarily. A design-build builder handles design and construction under one contract, working with its own architects, so you never hire one separately. You would engage your own architect when you want independent design representation or a highly unusual project. Both paths produce a fully custom home.

The short version

  • Design-build means one team handles design and construction together.
  • Anasazi keeps 500+ floor plans on file and works with three long-standing local architects.
  • You can bring your own plans, modify one of theirs, or design from nothing.
  • Plans get adapted to your specific lot, septic layout, and jurisdiction.
  • 3D renderings come after blueprint approval and are a separate cost.

What are your three options for getting plans?

Bring your own, start from a plan the builder already has and modify it, or design from scratch. All three are legitimate paths to a genuinely custom home, and the choice usually comes down to how formed your vision already is.

PathBest forWhat happens
Your own plansYou already have drawings you likeReviewed and adapted to your lot and jurisdiction
Modify an existing planYou know roughly what you wantStart from one of 500+ on file, then redraw as needed
Design from scratchYou have ideas but no drawingsDeveloped with the builder’s architects from the ground up

“Some clients come with a sketch on a napkin. Some come with a Pinterest board. Some come with nothing but ideas and a budget.”

The plans on file are starting points rather than catalog products. Layouts get redrawn, rooms move, ceilings change and exteriors transform, and within a few rounds the home is unrecognizable from where it started.

Also in this series: Can a custom home builder work with your own architect?

Finished custom home in Benton County with a metal roof and landscaped garden
A floor plan becomes a specific home after the lot, exterior, roofline, rooms, and daily priorities are resolved together.

What does design-build actually mean?

That design and construction are handled by the same team under one arrangement, rather than you contracting an architect separately and then finding a builder to execute the drawings. It removes the handoff between two parties who did not plan the project together.

Anasazi does both. The company builds fully custom homes, and it works design-build for clients who want one team handling design and construction together.

The practical difference is who resolves conflicts between the drawing and the site. Under design-build, the people drawing and the people building are talking to each other throughout, which is why buildability problems get caught during design rather than during framing.

Also in this series: Custom home builder vs. design-build firm: which is right for you?

When would you actually want your own architect?

When you want design representation independent of the builder, when the project is architecturally unusual enough to warrant a dedicated designer, or when you already have a relationship with an architect whose work you want. Those are real reasons and no good builder will argue with them.

What you get in exchange is a separate contract, a separate fee, and a coordination job that becomes partly yours.

If you go that route, confirm early that your builder will work from another architect’s drawings. Anasazi will, and the drawings still get reviewed for buildability on your specific lot.

John and Stephen Worlund of Anasazi Builders at a Tri-Cities homesite
Design-build keeps the people planning the home and the people responsible for constructing it in the same conversation.

How does the design stage actually run?

In rounds. The plan goes back and forth with the architect two or three times before decisions lock, and the lot drives much of it: orientation, setbacks, septic siting, view angles and any HOA envelope restrictions all shape what gets drawn.

Expect roughly two to six weeks for this stage.

Architects also integrate the plan with the permitting reality of your jurisdiction, which in the Tri-Cities can mean six different sets of requirements depending on where your parcel sits.

After blueprints are approved, 3D renderings let you see the finished home on your specific lot before construction begins. If something looks wrong in the rendering, it gets adjusted before anyone breaks ground. Those renderings are a separate cost, so ask about it during the design conversation.

The full design stage sits inside the nine-stage process here.

What does design cost?

It depends on which of the three paths you take, and it is worth getting the number in writing early. Modifying an existing plan costs less than a full custom design, and bringing finished drawings from your own architect means paying that architect directly rather than through the build.

Ask your lender too. Design fees are sometimes credited back as a line item on presentation of a paid receipt, though terms vary by bank and you should confirm rather than assume.

Whatever path you choose, the design decisions drive the construction cost far more than the design fee itself does. A plan with a complex roofline and many corners costs more to frame regardless of who drew it.

Also in this series: How much should you budget for design in a custom home?

Completed open-concept kitchen and living space built by Anasazi Builders in the Tri-Cities
Early design decisions connect the plan, the construction budget, and the finished spaces a family will use every day.

Common questions about architects and custom home design

Do I need an architect for a custom home in Washington?

Not as a separate hire if you work with a design-build builder. Plans still need to be prepared properly for permitting, which the builder’s architects handle.

How many plans does Anasazi have on file?

More than 500, all available as starting points to modify rather than fixed products.

Can I change a plan after design is finished?

Yes, though it gets more expensive as construction approaches. Changes during design cost nothing. Changes after the related work is built have to be paid for twice.

Do 3D renderings cost extra?

Yes. They are provided after blueprint approval and carry their own cost. Ask about it during design.

What if my plans do not work on my lot?

That is what the site evaluation and the architect review catch. Setbacks, septic siting and slope frequently require adjustments, and finding out during design is the cheap version.

How long does the design stage take?

Roughly two to six weeks, depending on how many rounds the plan needs and how quickly decisions come back.

Most people who ask this question do not need to hire an architect separately, but they do need to know which path they are on before design starts. A free first conversation sorts that out. You can also see completed homes, read what a fully custom home includes, or meet John and Stephen.