Build on Your Lot · Pasco & Franklin County

+ Schedule Lot Walk
Phase Pasco / Franklin Co. Scope Owner Lead Timeline Status
01. Lot Walk Placement, drainage, grading, setbacks & utilities John Worlund Step 1 On-Site Review
02. Custom Plans Custom layout from scratch, your plans, or 500+ library Design Team Included Fully Custom
03. Permitting Septic, well, structural & city/county building permits Anasazi LLC Pre-Frame Managed
04. Site & Utilities City sewer/water hookups or raw land well, septic & power John & Stephen Site Prep Turnkey
05. Construction Full custom home build through final move-in John & Stephen 5–6 Months 8–10 Mo Total
PASCO, WA City Lots · Raw Acreage · Franklin County

Build on Your Lot in Pasco, WA

Anasazi Builders builds custom homes on your lot in Pasco, WA, on city lots and raw acreage, with site evaluation, plans, permits, and full construction. If you have land in Pasco or in Franklin County, they can walk the property, check what the site needs, and take the job from planning to move-in.

John & Stephen Worlund ✦ Licensed, Bonded & Insured in WA ✦ 500+ Available Plans or Custom From Scratch
From Lot Walk to Move-In 8–10 Mo
Custom home built on acreage near Pasco
LOT plot-plan-setbacks.dwg
PERMIT Franklin County Septic & Building Permits
"Does this parcel need a drilled well or city water?"
"What about drainage, grading, and utility access?"
PDF septic-siting-approval.pdf
500+ custom-floor-plan-sketch.pdf
Tri-Cities custom home lot City Lot vs. Raw Acreage
WA Power, Sewer & Hookup Coordination

Building on your own land in Pasco involves site evaluations, drainage, grading, well and septic permits, utility hookups, and custom plans.

Every parcel—from an in-town subdivision lot to raw Franklin County acreage—starts with the land itself.

What Build on Your Lot Means

With Anasazi Builders, your land, permits, custom design, and construction come together in one fully custom process.

No repeated plans and no set option packages—from the first lot walk to move-in day.

Talk Through Your Pasco Lot →
Custom Home Design & Site Development

What does build on your lot mean in Pasco, WA?

Build on your lot means the home starts with your land. Anasazi Builders builds on your own lot, and every home is fully custom. The company says it does not use repeated plans or set option packages.

The service can cover a defined lot with utilities already available or raw acreage that needs more site work before building. Anasazi says work can include custom home design, land and site development on raw acreage, and full construction.

On raw land, that can mean power, well, and septic work before the first frame goes up. On some subdivision lots, utilities may already be in place. You can read more about our Tri-Cities build-on-your-lot service if you want the regional version of this process.

Quick Comparison · City Lot vs. Raw Acreage in Pasco

Defined City / Subdivision Lot

  • Already defined on paper
  • Utilities may already be in place at the site
  • If already on city sewer, a septic permit is generally not part of the path to a building permit
  • Sewer, water, and electric hookup fees can still apply

Raw Acreage / Rural Parcel

  • Undeveloped land in Pasco or Franklin County
  • Can require bringing in power, drilling wells, and installing septic systems before framing begins
  • Includes plot-plan work, well and septic documentation, and utility coordination
  • Drainage, grading, setbacks, and septic siting checked during the lot walk
Family-Owned in Pasco

Can Anasazi Builders build on my land in Pasco?

Yes. Anasazi Builders is a family-owned custom home builder in Pasco, and it serves the Tri-Cities. The company says it has built on raw, undeveloped land in Franklin County, bringing in power, drilling wells, and installing septic systems before framing began. If you have land outside city limits and are not sure what it may require, the first step can be a site visit.

Anasazi Builders LLC says it is licensed, bonded, and insured in Washington. John and Stephen Worlund are the father and son team behind the company.

How does the build-on-your-lot process work?

−

The process starts with a call or email about the land. You tell Anasazi where the property is, which utilities are already present, and roughly what kind of home you want to build.

From there, John walks the property and checks placement, drainage, grading, setbacks, septic siting, and utility access. If the parcel is a good candidate, the project moves into plans and design. Anasazi can adjust an existing plan, use one from its 500+ plan library, or design a custom layout from scratch with architects.

After plans are ready, Anasazi submits documentation to the appropriate city or county office and manages permits, including septic, well, structural, and building permits. Construction typically spans 5 to 6 months. The full process is typically 8 to 10 months.

Do I need plans, permits, or site work before building starts?

+

No plans are required before the first conversation. Anasazi says families reach out at different stages, including with finished drawings, a rough sketch, or just ideas. The company also manages permit documentation with the city or county as part of the process.

Site work depends on the property. A city lot and a rural parcel are not the same job. On raw land, early work can include permits, well and septic documentation, and utility coordination. If you are still evaluating property, this guide on what to check before you buy land is a useful next read.

How much does it cost to build on your lot in Pasco?

+

Anasazi Builders does not quote custom homes by the square foot. The company says pricing is built from the actual scope of the project. The final number depends on the design, the site conditions, and the finish level.

Lot type changes the early work. Rural land can add plot-plan work, well and septic documentation, and utility coordination. A city lot can still carry sewer, water, and electric hookup fees.

Step 1: On-Site Lot Walk with John Placement, drainage, grading, setbacks, septic & utilities
Site Review
Step 2: Plans & Custom Architecture Adjust your plan, choose from 500+ plans, or design from scratch
500+ Plans
Step 3: City & County Permit Management Septic, well, structural, and building permits submitted for you
Permits Managed
Step 4: Full Custom Construction 5–6 months construction · 8–10 months full process
Move-In
Bring Finished Drawings We review your completed plans against your Pasco parcel
Option A
Bring a Rough Sketch or Ideas No plans required before the first conversation
Option B
Permit & Utility Documentation City/county permits, well & septic docs, utility coordination
Handled In-House
Custom Home Design & Finish Level Priced from your actual layout and selections—never a square-foot guess
Actual Scope
Rural Land Front-End Scope Plot-plan work, well & septic documentation, utility coordination
Acreage Factors
Defined City Lot Scope Sewer, water, and electric hookup fees evaluated upfront
City Lot Factors
Pre-Construction Checklist

What should I check before I build on a lot in Pasco?

Before plans are finalized, it helps to understand how the lot will be reviewed and permitted.

01 / Early Ground Review

Site conditions should be reviewed early

On a raw parcel, Anasazi says it checks drainage and grading during the lot walk so the ground work makes sense before the house goes in. If you are comparing acreage, this page on building on unimproved land explains the front-end work in more detail.

Site grading and drainage preparation on custom home lot
02 / In-Town vs. Rural Permitting

City lots and rural parcels follow different paths

A city lot is already defined on paper. If it is already on city sewer, a septic permit is generally not part of the path to a building permit. Even so, sewer, water, and electric hookup fees can still apply on city lots.

Subdivision city lot custom home by Anasazi Builders
03 / Undeveloped Franklin County Land

Land outside city limits is a different process

Land outside city limits follows a different path than a subdivision lot in town. Anasazi says it has built on raw, undeveloped land in Franklin County. In those cases, power, wells, and septic systems can all be part of what has to happen before framing starts.

Custom home built on acreage outside city limits
Local Permitting & Published Proof

What does Anasazi Builders know about building in Pasco and Franklin County?

Anasazi Builders works in Pasco and handles permitting in Franklin County. That matters because jurisdictions can handle the process differently. Across the Tri-Cities area, all jurisdictions require a building permit, but they do not all handle the process the same way.

Pasco & Franklin County Permitting Septic-first rules & jurisdiction documentation
Nearby Proof: 5-Acre Raw Land Build Benton County · Drilled well & engineered septic
Nearby Proof: Subdivision Lot Build Kennewick (2022) · Utilities already at the lot
Septic Permit Before Building Permit Required in most jurisdictions unless already on city sewer
Key Rule
City & County Permit Management Full documentation handled for the lots we build on
Pasco, WA

Local Permitting Mastery

Some rules stay consistent across much of the region. In most jurisdictions, you cannot get a building permit without a septic permit first unless the lot is already on city sewer. Anasazi says it manages permit documentation with the city or county office for the lots it builds on.

This local knowledge is one reason people looking for a custom home builder in Pasco often start with a lot conversation first.

Verified Google Reviews

What do customers say about Anasazi Builders?

Customers mention on-site involvement and quality in Google reviews.

Custom home interior by Anasazi Builders

Proactive, on-site leadership

"Anasazi builders is a builder you definitely want to give your business to. John is on site and aware of what is going on through the whole building process. He is proactive and caring. He protects his clients investments as if it was his own. Tri cities could definitely use more builders of his caliber and I am absolutely happy to promote people who stand on quality."
MT
Marcelina T. Google Review · Tri-Cities Homeowner
Custom kitchen craftsmanship by Anasazi Builders

Unmatched quality recognized by peers

"Being a GC in the Tri-Cities area, I work with a lot of different contractors/builders. I noticed that the quality they provide is simply unmatched. If Anasazi does it, it will definitely be quality!"
D
Dennis Google Review · Tri-Cities General Contractor
Custom home exterior by Anasazi Builders

Quality work done with integrity

"If you want quality work done with integrity, these are your people!!"
LW
Lisa W. Google Review · Verified Client
FAQs

Frequently Asked Questions

Ready to talk about your Pasco lot?

If you own land in Pasco, or you are still deciding on a parcel, call Anasazi Builders LLC at (509) 412-2107 or schedule a consultation to talk through the site, the process, and the next step for your build-on-your-lot project.

Can you build on raw or unimproved land in Pasco? +

Yes. Anasazi Builders has built on raw, undeveloped land in Franklin County, including work that involved bringing in power, drilling wells, and installing septic systems before framing began. The company also builds on defined city lots, so the first step is matching the process to the parcel.

Do I need to own the lot before I contact you? +

No. Anasazi says families reach out at different stages. The first conversation can start with the parcel location, the utilities already present, and the kind of home you want, even if you have not purchased the land yet.

What does Anasazi check during a Pasco site visit? +

Anasazi says a site visit is used to review house placement, drainage, grading, setbacks, septic siting, well feasibility, and utility access so the property can be evaluated before plans move ahead.

Do I need plans before I reach out about building on my lot? +

No. Anasazi says people contact them with finished drawings, a rough sketch, or just ideas. After the first conversation and site review, the company can move into plans and design by adjusting an existing plan, using one from its plan library, or starting a custom layout.

How long does it take to build on my lot in Pasco? +

Construction typically takes 5 to 6 months. The full process is typically 8 to 10 months from the first conversation to move-in. Raw land can add front-end time because county permits, well and septic work, and utility coordination are different from a defined city lot.